Lake Chemicals

Description
JUST MCP was been selected by LAKE CM as a reliable business partner in building a brand-new manufacturing facility in Redditch. The building was converted into an impressive, contamination free laboratory with a nineteen-year plan for production. The laboratory produces protein drinks for sports use, as well as to be distributed to infants in developing countries.
All the manufacturing premises and partitioning works have been executed at a high professional level and been assessed and approved by the local authorities and regulatory bodies.
The facility obtained BRCSD and FSSC22000 certifications, it is running successfully and is a shining example of how good collaboration between trusted partners elevates both companies to a higher business level.
Full height Jumbo partition walls
The complex has been built in 148m high stud which our team installed, tape and filled. All of this was then painted in 2 coats of white emulsion paint. An opening was seamlessly cut out for the roller shutter door to be installed.
- 8 no. double doors sets complete with wrap around door frames and furniture
- 4 no. single paint grade doors with 150 x 1500 vison panels complete with frames and furniture
- 42 square meters of drylining in corridor and tape and filled and painted
Hygienic suspended ceiling
The suspended ceilings are clean care, and white rock has been used in the base for protection, stability, and hygiene.
- 373 square meters of 600 x 600 clean care suspended ceiling
- Washing room 41 square meters 100mm 4.8m high
Information About the Project
Start your project today! Get a FREE quote
If you are considering adapting your workspace, please get in touch today to discuss your options.






