PSP

PSP-11

Description

PSP are giants in the Audio Visual industry providing sound systems for live events and working with brands such as Lamborghini and costa. Looking to expand their HQ service area in Kings Norton they call upon the services of JUST MCP to install a mezzanine floor equipped with fire rating, goods lift and mesh guard. These works took 3 weeks from start to finish.

Mezzanine floor installation

The team installed a 380 m2 mezzanine floor which is 1 hour fire rated and fully certified. The fire rating included installation of suspended ceilings, column cases, fascia and fire blanket. This mezzanine floor also included a goods lift for the customer to transport their equipment between the 2 floors. Other products included:

  • Double flight 18 rise general staircase
  • Mesh guard single skin partitioning
  • 1 ton goods lift installed
  • AMF Star Ceiling tiles

Information About the Project

Location
Kings Norton
Sector
Audio Visual
Scope of Work
Mezzanine Floor
Completion Date
Aug 2024