TAFE, Newport

Description
TAFE was another big project that we have completed over a 4 month period. With lots of different elements, including a mezzanine floor and glazed partitioning.
Ground floor:
Entrance and reception lobby: We installed a small partition wall to create the lobby with 5.5 sqm of metal stud partitioning which has been tape, filled and painted with white emulsion. We also fitted a new door to the disabled toilet to tidy this up.
Meeting rooms: There have been 2 meeting rooms partitioned off using both stud partitioning with a seamless glazed partition for each entrance. These were sound quilted to stop sound travel between the rooms.
Changing and server room: 37 sqm of stud partitioning was erected to segregate off each room. Oak veneer doors including frames and furniture were hung for both rooms.
Store room and HV lab: We also fitted the partitioning for the store room and HV lab. These room also included installing 45 sqm of suspended ceiling using Artic Rockfon ceiling tiles.
Jumbo wall: We installed a jumbo wall to a total of 161 sqm which was tape, filled and painted. This included multiple doors and window modulars fitted with fire rated glass.
First floor:
Mezzanine floor: 2 mezzanins were installed into the warehouse. One totalling 10 sqm and another totalling 50sqm. Both mezzanines were fitted with double flight staircases.
Ceilings: The mezzanine floors were fire rated. This included the installation of 1 hour fire rated ceiling tiles and 14 coloumn cases which were also 1 hour fire rated. There was also 318 sqm of suspended ceiling going throughout at 1 level governed by first floor offices.
Office partitioning: We fitted out a few offices throughout the warehouse, including seamless glazing for the CTO office, partitioning and additional windows for the upstairs office.
Information About the Project